Smart planning, made simple and precise.

Modool Plan keeps design, procurement, production, testing and delivery in one living schedule. When a new order lands, the plan reflows around it — before conflicts become delays and idle hours become lost capacity.

18+
Months in live production
40%
Less operational downtime
1–3
Months to measurable ROI
Live plan · W01–W12
Plan stable
CONFLICTS 0 WO-117 DELIVERY LOAD 38%
Interactive demo · simplified schedule
Built for complex industry
Electrical switchgear Energy storage Renewable energy Industrial machinery Grid infrastructure
WO·01 — The problem

The plan that dies on Monday morning.

In Engineer-To-Order manufacturing every product is different, every order touches every department, and one late drawing or missing part can stall an entire shop floor. Static spreadsheets can’t keep up — so planning turns into firefighting.

Scattered spreadsheets

Each department plans in its own file, on its own assumptions. Nobody sees the whole picture, and the “master plan” is outdated the moment it’s printed.

Symptom · No single source of truth

Cascade delays

A two-day slip in engineering becomes a two-week slip in delivery, because downstream departments find out too late to react and reshuffle.

Symptom · Late escalation

Invisible capacity

Machines wait for material while people wait for drawings. Without a live view of who is free and who is overloaded, capacity quietly leaks away.

Symptom · Idle hours nobody booked
WO·02 — How it works

Smart goes in, smart comes out.

Modool Plan runs on three things every manufacturer already has. Feed them in once, keep them current, and the engine does the heavy lifting.

Inputs
Resource & capacity databasePeople, machines and test bays — with their availability and skills.
Activity times & requirementsHow long each step takes and what it needs to start.
Process sequenceThe order of steps that turns a contract into a delivered product.
Planning engine
Outputs
Synchronised process plansOne schedule across every department, always current.
Live capacity overviewFree / busy at a glance — per person, machine and cell.
Simulations & historyWhat-if scenarios for tomorrow, OTD analytics for yesterday.
WO·03 — Proven in production

Not a prototype. A plant runs on it.

Modool Plan was built on a real factory floor and has been scheduling live high-voltage switchgear production for over a year and a half — with results that compound every cycle.

18+
Months in continuous use across high-voltage switchgear manufacturing
40%
Reduction in operational downtime achieved on the floor
1–3
Months from kickoff to measurable return on investment
70%
Less manual setup time with AI-assisted onboarding of your data
Figures from the reference deployment · results vary by operation
WO·05 — The principle

Our guiding principle: make planning SMART.

SSimple

Clear enough that the shop floor actually uses it.

MMethodical

Model-based, not gut-based — every plan is reproducible.

AAligned

One schedule that every department commits to.

RRealistic

Resource-based — built on the capacity you really have.

TTrackable

Plan vs. actual, visible at every step.

WO·06 — Your move

Plan for success.

A pilot starts with your real orders and your real capacity — not a slide deck. In one to three months you’ll know exactly what synchronised planning is worth to your operation.

FormatPilot on your live data
ScopeOne bottleneck, end to end
Time to ROI1–3 months
Your effortAI-assisted onboarding
CommitmentScale only if it proves itself